
You have paid for the stall. Now the real question: what goes on the table? Resellers tell us the same story every season: the booking is done, but the stock isn’t ready. Here is a simple plan that avoids that.
Start with the calendar, not the catalogue
Made-to-order production takes 15 to 25 days, and new samples take about 30 days. Count back from your show date and place the order before that window closes. If you are already inside it, ask for ready stock instead.
Build the table in three price bands
- Entry pieces: studs, small pendants and rings that sell without a second thought. These pay for your stall.
- Core pieces: earrings, pendant sets and bangles that most buyers come for.
- Hero pieces: two or three statement sets that stop people at your table, even if they sell slowly.
Mix your finishes
Different buyers want different looks. Carry at least two finishes, for example yellow gold and antique or Victorian, so one table serves both tastes.
Keep weights in mind
Silver is sold by weight, so lighter versions of a design open it up to more buyers. Ask your manufacturer which designs can be made lighter and what changes when they are.
Plan the follow-up before the show
Most show visitors do not buy on the day. Collect WhatsApp numbers, and send photos and a video call invite within two days.
Short on time?
We keep ready stock in our Jaipur workshop and show it on live video calls. Minimum order is 500 g and you can mix designs within it. WhatsApp 088248 91530.